Home >  News > Dry running capability vital for nuclear plant

World Pumps October 2014

When two 700 MW units of the Rajasthan Nuclear Power Plant in India required booster pumps and the main boiler feed pumps, Termomeccanica Pompe had to prove in advance the dry running capability of its equipment. By using a test pump with similar characteristics, the company was able to verify that all the design criteria used for the real project pumps was able to fully guarantee a proper behaviour.